STEAM BOILERS FURNACE SMOKE TUBE BOILERS

  • 04-13

    Amount of evaportaision 4.8 tons per hours.

  • 04-16

    Furnace smoke tube.

  • 04-18

    Furnace smoke tube, cleaning by the special tool.

  • 04-20

    Inside of the oven.

  • 04-22

    Burner, Gas nozzle. Finish to clean.

  • 04-24

    Inside of the oven. Cleaning the oven wall.

  • 05-16

    Cleaning both of the tube.

  • 05-22

    Water level guage.

  • 05-28

    Water level gauge prepared and recoveried.

  • 06-22

    Water chamber cover is going to recoveried.

  • 06-25

    Safety relief valve. Took off from the boiler.

  • 06-12

    Safety relief valve was decomposed. Valve sheet polishing on the surface plate with the compound.

  • 06-15

    Check straightness of the valve stem and the valve spring on the surface plate.

  • 06-17

    After the full maintenance. Test-work.

  • 06-19

    Steam pressure gauge. We use “Mega pascal” in Japan.