Works
STEAM BOILERS FURNACE SMOKE TUBE BOILERS
-
Amount of evaportaision 4.8 tons per hours.
-
Furnace smoke tube.
-
Furnace smoke tube, cleaning by the special tool.
-
Inside of the oven.
-
Burner, Gas nozzle. Finish to clean.
-
Inside of the oven. Cleaning the oven wall.
-
Cleaning both of the tube.
-
Water level guage.
-
Water level gauge prepared and recoveried.
-
Water chamber cover is going to recoveried.
-
Safety relief valve. Took off from the boiler.
-
Safety relief valve was decomposed. Valve sheet polishing on the surface plate with the compound.
-
Check straightness of the valve stem and the valve spring on the surface plate.
-
After the full maintenance. Test-work.
-
Steam pressure gauge. We use “Mega pascal” in Japan.