MAINTAIN THE SAFETY RELIEF VALUE

  • 10-18

    Safety relief valve.

  • 10-22

    Safety relief valve.

  • 10-24

    After decomposition.

  • 10-27

    Check up the valve spring and the valve stem straightness on the surface plate.

  • 10-29

    Grind the value sheet. Use the compound.

  • 10-32

    Finished to check up and prepared.

  • 11-21

    After the maintenance. It was allowed to use for one year.

  • 11-24

    The temperature meter and the pressure gauge after the maintenance. It’s ready to use.