Works

  • 22-12

    Existing Indoor unit. Before to removed.

  • 22-15

    The work of removing the indoor unit.

  • 22-17

    After removed the indoor unit.

  • 22-19

    The indoor units. New one and the existing unit.

  • 22-21

    After installed the backboard.

  • 22-23

    After installed the indoor unit.

  • 23-13

    Outdoor units. Before removing. (Right side)

  • 23-16

    The work of removing an outdoor unit. To punpdown the freon gas into the unit.

  • 23-19

    After removing a outdoor unit.

  • 23-22

    The outdoor units. New.one and the exiting unit.

  • 23-24

    After installed the outdoor unit.

  • 23-26

    Installing the electrical wires, transmission line and the freon pipes.

  • 23-28

    Vacuum bleeding the air from the freon pipes using the vacuum pump.

  • 23-30

    After installed the electrical wires, transmission line and the freon pipes.